19/08/2026
R.I.P Mike.
Plastering Painting Carpentry
No job too small
19/08/2026
R.I.P Mike.
26/06/2026
Been a busy few weeks.
24m x 9m shed Laboratory.
A few more weeks to go.
18/03/2026
Patio ceiling replaced.
Sheeted with Knauf sheetrock plus (water resistant and sound resistant) plaster board. Undercoated with Wattyl Ultra PSU. Painted with Solagard flat (colour matched)
18/03/2026
Office space. Installation is Higgins polyester R2.5, Sheet is Knauf sheetrock plus (water resistant and sound resistant) plaster board.
26/02/2026
Lawyers office.
25/02/2026
Customer doing a kitchen make over.
25/02/2026
Archways no longer.
More modern look.
25/02/2026
Another garage ceiling replaced.
Stripped, sheeted and whole garage painted.
25/02/2026
Builder sheeted this one.
Set and sanded. Led light strip's are fitted next to the beams flush with the ceiling plaster board.