26/10/2023
Presenting the soon-to-be iconic Pakenham Station rail bridge, proudly towering at an impressive 15 meters!
Our commitment to innovation continues to shine as we make significant progress on our latest project which we have installed and manufactured over 450 tonnes of steelwork to date.
The lift shafts and canopies were expertly maneuvered over the rail using a robust 250-tonne crane for the impressive 2.5km rail bridge.
Our remarkable pre-fabricated lift shafts which were transported as fully assembled structures are now successfully installed as one piece on site.
By utilizing pre-fabricated materials, we have significantly reduced waste and minimized the environmental impact of this project. This aligns with our vision of creating a greener future for our communities.
Stay tuned for updates as we embark on this exciting journey!
06/09/2023
Check out our new 165kW solar panels installed by Power well.
With all panels now installed we are leaning towards a more sustainable, energy saving future that will help reduce our carbon footprint by reducing carbon emissions. We are proud to be a part of this sustainable initiative - let's keep pushing for a greener future!
Thank you to the incredible team at Powerwell for such seamless delivery.
15/08/2023
Metro Tunnel: Over 1 Million Pieces Paving the Way to Connectivity
Stilcon has reached a monumental milestone in its journey! It's hard to believe that 655 days ago, we commenced work on the city-defining Metro Tunnel project, and we have now commenced the highly anticipated commissioning by the CYP rail team.
Throughout this incredible journey, our dedicated team at Stilcon has showcased exceptional commitment and skill, and an unparalleled work ethic. We have successfully designed, fabricated, coated, and installed over 1 million pieces of steel within the 16km tunnel.
We would like to extend our heartfelt gratitude to each and every member of the Stilcon family who have contributed an unwavering commitment, passion, and expertise that has made this remarkable achievement possible.
04/08/2023
Building a better future, Melbourne's first train/tram interchange.
"At Stilcon , we take immense pride in being a part of the monumental project that is Anzac Station. As one of the leading steel solutions providers in the industry, we have played a crucial role in shaping the infrastructure that will connect communities and transform the way people travel. From the very beginning, our team of skilled engineers have been dedicated to providing first-rate steel solutions for Anzac Station including the impactful combination of high-quality, structural and architectural steel, distinctively coated in an environmental green intumescent paint and combined with cross laminated timber, that forms the backbone of this remarkable transportation hub.
Anzac Station is a symbol of connectivity and community, we are proud to have played a pivotal role in building the infrastructure that will bring people together."
27/08/2020
A big lift at Epworth Hospital for . Thanks the the lift!
� @ Epworth Hospital
19/06/2020
Project Photo - Carrum Station
13/05/2020
Project Photo - West Side Place
@ Melbourne, Victoria, Australia
26/08/2019
Fresh cuts...!
-
-
-
-
-
�
23/08/2019
Project Photo - Deakin University
-
-
-
-
-� @ Deakin University, Melbourne Burwood Campus
10/05/2019
Project Photo - Deakin University
�.�.�.�.�.� �
21/03/2019
Project Photo - Deakin University
@ Deakin University, Melbourne Burwood Campus