03/31/2026
This bathroom laundry was not just a job but it changed the lives of my friends and clients and .torpey , after they moved into their new home the basement flooded terribly, and they were left with a quite difficult living situation, i renovated the basement living area in 2024 and on and off in 2025 as budget and time would allow I finally got to build them their dream bathroom and a fully functional, non dusty, non gross laundry room with storage. I’ve included some before pictures to see the extent or the damages and where we came from to what we have now. I think the use of space is perfect, with design help from the homeowners , we managed to make this space work. I’m very proud of this one, and happy to see my friends, so excited to have a fully finished home for the first time in almost 3 years.
01/04/2026
Swipe right for a christmas miracle, managed to complete this fireplace refresh just in time for Santas arrival, get in touch to get yours done
11/26/2025
Completed this bathroom recently, homeowner to grout in counter company to install quartz curbs and niche shelf. Hexagonal tiles can be tricky but these turned out great. Another happy customer.
04/19/2025
Another bathroom completed, This was a full renovation, replacing the bathtub and plumbing throughout. One of the prettiest but most challenging floor installs I’ve done, yes they are all individual pieces. This was a one week turnaround start to finish. Swipe to the end to see the before and after pics.
04/15/2025
I’ve had the pleasure of working on some incredible projects in my days in this industry, but this one here may well be one of of my favourites, located at Montroyal school North Vancouver, in a wonderful new facility for young children. I was tasked with building a custom ‘TREE’ bookcase and a reading NOOK with ‘deserted island’ inspiration, while also carving windowsills to encompass the marrying of interior with the wonderful exterior. This was all hand cut, hand carved, and painstakingly put together. And i loved every minute. The children, and facility staff are incredibly happy. Now onto the next one
03/31/2025
Another epoxy deck completed, 300 square ft. Get in touch for your free estimate
03/31/2025
Removed damaged concrete wall and existing fencing, remove planter beds, built new retaining walls with ties , the integrated the new fence , will be painted/stained in summer time.
Another happy customer
03/22/2025
One week bathroom turnaround. All new fixtures, fitting, tub, tiles on floor and walls, lighting, and hardware. A wonderful job that has turned out fantastic well. Another happy customer.