26/07/2025
Yesterday we were very excited to hand over a finished back yard renovation we have been working on for the summer.
It was a full ground up transformation with an almost unrecognisable yard returned to the owners.
We sourced the larch for the pagoda from the lake district and treated it with the traditional Yakisugi burning and oiling technique.
The deck was created using Millboard and the main paving area was recycled York stone.
Thanks to Hss for the groundwork tool hire.
23/12/2024
Another Christmas, another Wren Kitchen fitted. We were lucky enough to get to spend two weeks in Llandudno looking over the sea while we fitted this lovely kitchen. All parties are very pleased.
Have a merry Christmas everyone and we look forward to a new year of amazing projects.
07/12/2024
We finished off this large patio door yesterday. Took out the old window and supplied and fitted the new aluminium door.
We were also asked to source and install an external copper shower that would take on a patina as time goes on. Lovely job
10/10/2024
Another week, another hardwood front door. This time we had to make an arched Sapele frame to match the brickwork on this beautiful Victorian terrace. Door and frame finished in a stunning little green paint company colour. I think it really sets off the Brass and brickwork. Once again a happy customer.
01/10/2024
Nice little job completed today. Thanks goodness we didn’t have it booked in for yesterday with all that rain.
Blue composite door delivered and installed. Customer very happy and we got home dry. Winner all round.
20/09/2024
We were really honoured and pleased to win the contract for the replacement of the main double doors at St Steven’s church in Bury. The old ones had been repaired that many times I’m not sure how much more time they had left. Needless to say we jumped at the opportunity to Design and make these replacements.
Manufactured using Sapele hardwood and constructed with through tennons, these doors won’t be going anywhere for many years to come.
15/07/2024
Long day today. Final push to finish this slick looking kitchen for a customer in Chester. We knocked through into a dining room, put in a new stud wall, re plastered and fit the new kitchen with flooring and a new radiator. We are dead pleased with the results.
18/06/2024
What a lovely review. We worked really hard on this project and everyone was very pleased with the outcome.
15/06/2024
Wow, we finally got to the end of the radio diamond studio renovation. Looks the part now. Just come from the grand opening and everyone loves it. A real buzz about the place. Looking forward to seeing the good it does for the community.
10/05/2024
Update on the weeks work. a large amount of the plasterering done, store run built and boarded and new lowered ceiling plastered, painted and down lights installed. Pretty good week all things considered. Exciting times! It’s all coming together 😁
08/05/2024
Here we go. A quick update on progress at radio Diamond. We have been busy finishing the engineers room ceiling with a skim coat and have almost finishing the main band room skim. The recording booth now has lights and the sound insulation is going in to make the space more conducive to good recording. More pics tomorrow
02/05/2024
Cracking on at radio diamond today. We are putting in a lowered ceiling with led mood lighting. Here’s the frame coming together.