18/12/2017
ALDAR International Co
Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from ALDAR International Co, 306 Street # 18 , Building # 36 Al Baradya, Basra.
18/12/2017
تعلن شركة الدار الدولية عن حاجتها للاختصاصات التالية
Marian Operator
Material Controller
Material Engineer
للعمل في مواقع الشركة على من لدية الخبرة على ان لاتقل عن 3 سنوات في اختصاص المواد في مجال النفط ارسال السيرة الذاتية على الايميل التالي
[email protected]
[email protected]
مع الشكر والتقدير
08/09/2015
Electrical works for Slug Catcher
Client : Shell/CCC
North Rumaila /Basra
07/09/2015
06/09/2015
Badra oil project
06/09/2015
ISO Certificates
06/09/2015
.AlDar International Co
Clients
06/09/2015
Operation and Maintenance Contracts for Badra Oilfield
Provisions of competent, experienced and a professional manpower and equipment/vehicle as further described in this scope of service to support:
• Pre commissioning
• Commissioning
• Maintenance
• Shutdown activities
Location : Badra Oilfield—Waset—Iraq
Client : Petrofac International (UAE) LLC .
Daate : 2015.
06/09/2015
Air Blowing and Chemical Cleaning -FCP Gas Train 1 & Train 2
Scope of Work
The below described scope of work is for Train 1 only. Train 2 scope of work currently is
not fully clear. Once SOLAR packages arrive from Houston and cleanliness inspections
have been completed, Work-packs shall be generated by COMPANY and will be
submitted to Subcontractor for executions using the same unit rates as defined for Train
1.1. Air Blowing
A Boroscope exercise was carried out on skids delivered from Houston, Process skids
and pipe rack modules. The findings, minor debris and scaling, deem it necessary to
Perform air blowing as per the following Work Packs.
Work Pack no. 1 – Instrument Air
Work Pack no. 2 – 1st Stage Filter Sep
Work Pack no. 3 – 1st Stage Discharge Coolers
Work Pack no. 4 – 2nd Stage Compression
Work Pack no. 5 – 2nd Stage Discharge Cooler
Work Pack no. 6 – Station Recycle
Work Pack no. 7 – FG/SG Pipework
Work Pack no. 8 – FG/SG Skid
Work Pack no. 9 – FGC Skid
Work Pack no. 10 – Turbine Utility Skid
Air Blowing will be carried out as per the referred procedure ’FCP Gas Train 1
Cleanliness’ (Doc. no. GAS1-GP1-SIP-MP-6025-0001). Subcontractor shall supply all
manpower, consumables, tools, plant and equipment to execute air blowing works.
1.2. Chemical Cleaning
In addition to the air blowing it has been decided that chemical cleaning should be carried
out on the following systems as per the referred marked-up P&IDs
System : Material
Fuel Gas : Stainless Steel & Carbon Steel
Seal Gas : Stainless Steel
N2 : Stainless Steel
Client : Shell
Date: 2015
05/09/2015
Mechanical Cleaning for static equipment at KAZ plant
The SOW for this project is contained but not limited to complete this tasks:
Dismantling of existing Piping, equipment, Exchangers, heaters….for mechanical cleaning and re-installation work, the work includes Mechanical works, purging, hydro testing, and fabrication for some items.
Client :Technip- BGC
Location : Basra- Iraq
05/09/2015
Modular Building Installation-DS7 ISBL Water Injection System
Modular Building Installation- Iraq- Basra- west Qurna 1 (M095) DS7 ISBL Water Injection System
Scope Of work:
Installation of prefabricated steel structural building for LCR ,The project is located in WQ1, the work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system
Client : Saipem
Location : Iraq/Basra/ West Qurna 1
date : Sept 2015
Click here to claim your Sponsored Listing.
Location
Contact the business
Website
Address
Basra