12/04/2025
Assembling chairs to match the game table!
10/24/2025
Just got this from a customer! Toilet had a leaky valve. Less than a $20 part that likely cost them that much a month in water! Don’t let your money go down the drain!!
09/07/2025
Got it done. One leg required a fix on the threaded insert and one leaf is going to require a couple passes on the jointer! But for the money I think my wife will be pleased!!
09/05/2025
Always something different. Game table loading.
06/29/2025
When you’ve got some plywood cut offs your tired of tripping over and your daughter wants some book shelf risers. The stars align and you knock it out. Long hot afternoon. Need a bit of sanding then they’re are done.
06/01/2025
Busy day. Put running boards on a 2025 Palisade and assembled a cat house. Never know what jobs will pop up!
03/16/2025
Back at the shelf work. Woodworkers always need more clamps!! Trust me the 12 I have is half of most of the woodworkers I know. Oh well good excuse to work on something else while these dry up!
03/15/2025
We replaced an old tv at a family vacation house. Creationsbylma and Riley Anne Photography convinced me to make it into a cat bed. Very happy customer bought it off FB Marketplace!
01/31/2025
3 sets of shelf bands cut 5 more to go!
01/27/2025
Busy weekend! Friday I installed a water filter and Saturday repaired some toilets!
01/20/2025
The answer is no I cannot get this done in a weekend!! 28 mitered cuts remain along with drilling for joinery, sanding and assembling. It’ll get done in time.
14 hours if work in already which does not include the layout and design work!!