09/11/2026
Amazing how much work goes into 2 signs and 35 boxes.
Saw the lumber
Cut it down to sizes
Plane it
Cnc the names
Tape, paint, sand
Assemble it
Sand it
Coat it (if requested)
Thats at least 3 days with 2 of us non stop. Sometimes till 9pm.