Good morning. Another location, another beautiful sunrise.These sunrises definitely hit nice is these country towns. This time in rifle range putting our Kobelco sk17 to work.
There will be heaps of job posts to come as we start to catch up over the coming weeks.
HAVE A GREAT WEDNESDAY EVERYONE!!!
01/09/2026
Good morning everyone how's this for a view this week.
Sorry for the lack of posts and slow responses we have been flat out trying to catch up. Have a great day.
21/07/2026
Happy Wednesday everyone! A bit wet here in Collingwood Park this morning but check out this epic rainbow.
A Bit of an update we a slowly getting back on track with jobs. And will start to get onto everyones outstanding quotes over the next week. We apologise for the slow turn around on these at the moment.
Have a great day!
18/07/2026
Good morning everyone! Check out the final pics of this yard creation we completed in Collingwood park. It was a full clean out and start again after a previously failed landscaping attempt from someone else. We incorporated the requests from the home owner. Like using existing plants and sinking the rose pots in a raised rock garden. Mortared brick edges (previously just sat on the ground) , new garden beds across the back, astro turf. Garden soil and bark. Natural slate pavers at a good walking spacing Etc. We also corrected ground fall and installed 3 extra ground drains to alleviate water pooling. These are the sort of transformations that we enjoy seeing come together ❤️.
10/07/2026
Small 2.6 x 1.7m deck built in Ripley under the clothesline. Finished with ekodeck in riverbank red.
25/06/2026
Happy Friday everyone. This is a small deck we are finishing up in Ripley, picture framed and using composite decking on top.
Finshed photos to come.
Also just wanted to update everyone. We are a couple of weeks behind. Between the weather and the large make over that we started at the start of may had lots of unforseen hidden issues from a previous company. that we have had to address along the way. we are still finishing up that cant wait to reveal the transformation. We have been pushing through including weekends to try catch up. We do apologise for the slower than normal turn around on quotes. Have a great weekend.
04/06/2026
Good morning! Bit of a progress update on this project in Collingwood park. After our first pre start video the other day.
This client had hired someone a while ago to prepare the area and do stepping pavers, rocks and a few other things. Until a few red flags started. We have the task of making their vision happen. But unfortunately when something is started or done with poor preparation everything has to come out and start again.
We have cleared alot of the grass and started re shaping the ground fall. We will also add extra ground drainage were there is pooling issues. But along the side where the looked to be fall it was not good as you can see in the photos there is black plastic under the rocks its hiding large hollows along the house that were trapping water and also the drains were above that level with plastic covering them doing nothing.
We will get this preparation with proper fall before restarting.
Have a great day everyone!
23/05/2026
Good morning everyone! The rain has slowed us up but kept on moving. Also when doing any projects where digging its important to check for under ground services with a before you dig checks. This job showed a gas line up the centre of the complex. That finished in close proximity. So we engaged a service locator and found that the old gas line was polly. With no trace line. And the gas company required a vaccum pot hole to confirm it didn't come through to the wall.
This is the second wall finished approximately 11 metres long with TUFFPOLY composite system in charcoal.