19/09/2025
Afew bedroom installations recently carried out
Professional kitchen installation from start to finish
19/09/2025
Afew bedroom installations recently carried out
30/11/2024
Howdens traditional kitchen and utility in chilcomb porcelain shaker door with decorative plinths finished with 30mm quartz in Carrara finished with upstands and splashback
MBP Plastering with overboarding of ceilings and full skim throughout
H & P Electrical Contractors Ltd with 1st and 2nd fix electrics and supplied all fixtures and fittings
ITW Heating and Plumbing with all plumbing works undertaken
Rich faulkes tiling services with floor prep and tiling throughout
Signature Building & Joinery with all 2nd fix joinery of skirting boards
Kitchen installation we done recently
18/11/2024
Afew bedroom wardrobes recently installed.
18/10/2024
Traditional shaker kitchen supplied by ability kitchens in dust grey finished with 30mm white quartz
H & P Electrical Contractors Ltd with 1st and 2 fix and supplied all fixture and fittings
MBP Plastering with all plastering works undertaken
ITW Heating and Plumbing with all plumbing and gas work undertaken, also installation of designer radiator
Signature Carpets & Flooring with all prep works for installation of LVT, supplied and fitted in herringbone style
Wrightway Windows & Construction Ltd supplied and fitted of new bifold door and making good the brickwork on the outside
02/05/2024
Handleless kitchen in cashmere gloss with 22mm luxury laminate in gold calacatta gloss worktops finished with the tek wall splash back
H & P Electrical Contractors Ltd with 1st and 2nd fix electric and supplied all fixture and fittings
MBP Plastering with all plastering works carried out
ITW Heating and Plumbing with 1st and 2nd fix plumbing connections
Signature Carpets & Flooring with installation of LVT flooring
11/04/2024
Traditional timber shaker kitchen in moon white with Swiss oak luxury laminate finished with upstands
Island in ash grey finished with curved posts!
H & P Electrical Contractors Ltd with 1st and 2nd fix eletrics and supplied fixture and fittings
ITW Heating and Plumbing with 1st amd 2nd fix sink connections
MBP Plastering with all plastering works carried out
15/03/2024
Pebble grey gloss slab door with calacatta cloud Matt worktops finished with calacatta tek wall splashback
H & P Electrical Contractors Ltd with 1st and 2nd fix electrics and all lighting and fixtures supplied
MBP Plastering with all plastering works undertaken
ITW Heating and Plumbing with 1st and 2nd fix plumbing and capping of gas works
Signature Carpets & Flooring with supplied and fitting of LVT in herringbone flooring
08/03/2024
Navy blue Matt shaker kitchen with Oak lodge luxury laminate worktops finished with an upstand!
H & P Electrical Contractors Ltd with 1st and 2nd fix electrics and supplied all fixture and fittings
MBP Plastering with overboarding of ceiling and skimmed through
ITW Heating and Plumbing with 1st and 2nd fix plumbing and connection of gas hob
Signature Carpets & Flooring with installation of quickstep laminate flooring
01/03/2024
Traditional shaker kitchen in moss green Matt with Enzo white quartz worktops finished with upstands and splashback
H & P Electrical Contractors Ltd with 1st and 2nd fix electrics and supplied lighting
MBP Plastering with all plastering works carried out
ITW Heating and Plumbing with 1st amd 2nd fix plumbing and installation of plinth heater
Signature carpets&flooring supplied and fitted LVT in herringbone finished with border
16/02/2024
Forest green shaker kitchen with Treviso white quartz finished with upstands and splashback.
ITW Heating and Plumbing with 1st and 2nd fix plumbing and installation of Quooker hot boiler tap!
Signature flooring & carpets with installation of herringbone LVT flooring finished with border
14/02/2024