22/06/2024
Block work nearly done
Gardening, domestic demolition and building work
22/06/2024
Block work nearly done
22/06/2024
Internal corridor floor removed ready for blinding dpc, insulation and new concrete floor
22/06/2024
Protection in place to keep clients main room dust free
22/06/2024
Boarded and skimmed
22/06/2024
Props in place joists and steel supported internal wall removed to a level 30mm bellow original foundation ready for concrete and block wall
22/06/2024
Newly boarded and skimmed looks loads better
22/06/2024
Ceiling stripped ready for new subframe and wiring
22/06/2024
Foundation poured ready for block work
22/06/2024
Outdoor foundation trench dug 300mm below existing house foundation ready for concrete
22/06/2024
Rendered ready for painting
22/06/2024
Routed out for needling and then Mortard in at 45mm depth 500mm length