Lipley And Parker

Directions Website Contact the business

Lipley And Parker South London design and fabrication partnership. Creating any bespoke project in any chosen media.

159. Boscombe. 2026.-AOMD - Architecture Office Michael Dillon BanfieldWood Structures -
04/10/2026

159. Boscombe. 2026.
-
AOMD - Architecture Office Michael Dillon
BanfieldWood Structures
-

159. Broadwick. 2026.-CAKE 🔶🟥🔵 BROADWICK LIVE -Photos: -
04/10/2026

159. Broadwick. 2026.
-
CAKE
🔶🟥🔵
BROADWICK LIVE
-
Photos:
-

156. Cormont Road. 2026-Studio McW -   -fibre
04/10/2026

156. Cormont Road. 2026
-
Studio McW
-
-fibre

Dunlace Road. 2026. -Rear elevation.-A particularly involved part of the project, balancing structure, waterproofing and...
14/06/2026

Dunlace Road. 2026.
-
Rear elevation.
-
A particularly involved part of the project, balancing structure, waterproofing and glazing while maintaining a tight budget.
-
To reduce the groundworks and steel package, we brought the new eaves line in line with the existing house and incorporated two load-bearing brick piers at either end of the elevation rather than a portal frame, saving thousands in steel and foundation costs. The piers were carefully aligned with the joinery layout, ensuring no usable internal space was lost.
-
The real challenge came in integrating the waterproofing and glazing package. We worked closely with our long-time collaborators at CAB Workshop to simplify a complex series of flashing details, ensuring robust drainage and weathering while maintaining the clean architectural intent. Lipley & Parker fabricated bespoke galvanised steel frames on site, creating precise interfaces between the masonry, glazing and waterproofing systems and allowing the entire assembly to function as a coordinated package.
-
Working collaboratively from the outset, the glazing was rationalised into standardised pane sizes to maximise efficiency and minimise cost, while breaking away from a traditional window arrangement. All timber sections were kept to 100mm or less, creating a lighter appearance and reducing material usage.
-
As always, CAB fabricated the glazing off-site in their workshop, with Lipley & Parker undertaking the installation. This integrated approach delivers tighter coordination, greater cost efficiency and a far more cohesive result than a traditional contractor-supplier relationship.
-

glazing

Dunlace Road. 2026-A project that perfectly reflects our approach to design, consultancy and construction.-We were initi...
14/06/2026

Dunlace Road. 2026
-
A project that perfectly reflects our approach to design, consultancy and construction.
-
We were initially approached with a Stage 3 package by TYPE Architects. Following significant increases in construction costs over the 3 years since it was designed , the original scheme had become unachievable within the client’s budget.
-
Working closely with the client, we redesigned and rationalised the project in-house, retaining the essence of the original concept while rethinking materiality, layout, detailing, cabinets, MME, design, Groundworks, steel package and construction methodology to bring it back within budget.
-
As always, this was a genuinely collaborative process. We believe the best projects come from involving skilled craftspeople and specialist subcontractors from the earliest design stages, drawing on their expertise rather than prescribing solutions.
-
The result is a project shaped by collective knowledge, coordinated by Lipley & Parker, and delivered through the combined efforts of an exceptional team.
-
Designed collaboratively. Built collectively.
-
Lipley and Parker - Design and Build
WAJ Studio - Construction Design
TYPE - Architectural Concept
Cab - Door and Window Manufacture
Somer - Freestanding Kitchen
Wunsch - Inbuilt Joinery
Colin Ross Photography - Photography
-
-
-

24/04/2026

North Hill. 2026.
-
Spring is here.
-

North Hill. 2025 - 2026.-Architectural Design by WAJ Studio. Lipley and Parker involved from the outset.-Breaking ground...
13/10/2025

North Hill. 2025 - 2026.
-
Architectural Design by WAJ Studio. Lipley and Parker involved from the outset.
-
Breaking ground next week. Very excited about this one.
-
-
-
-

Cormont Road. 2025.-Architect  . Lipley and Parker lead contractor. Live project 2/3.-We’re Hiring — Site Carpenter / Ge...
12/10/2025

Cormont Road. 2025.
-
Architect . Lipley and Parker lead contractor. Live project 2/3.
-
We’re Hiring — Site Carpenter / General Builder
-
We’re looking for an experienced site carpenter or general builder to join our ever-growing team.
-
The ideal candidate will have a minimum of 5 years’ experience working on residential construction sites and be confident operating independently within a small, skilled team.
-
We’re not looking for a senior management role, but rather someone who can bring strong practical experience, problem-solving ability, and attention to detail, adding to the team’s collective skill set without requiring on-site training.
1
If you take pride in high-quality craftsmanship, enjoy working collaboratively, and want to be part of a design-led construction company delivering bespoke projects across London, we’d love to hear from you.
-
Please send any CVs to [email protected].
-

Dunlace Road. 2025.-Redesigned and value engineered by WAJ Studio and Lipley and Parker. Live project 1/3. -----        ...
11/10/2025

Dunlace Road. 2025.
-
Redesigned and value engineered by WAJ Studio and Lipley and Parker. Live project 1/3.
-
-
-
-
-

Address

London

Alerts

Be the first to know and let us send you an email when Lipley And Parker posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Lipley And Parker:

Shortcuts

Share

Category