DB Wood Mastercrafts

Call Directions Website

DB Wood Mastercrafts dbwoodmastercrafts.com
Hand Made Garden Furniture & Bespoke Joinery
Hand Crafted & Hand Delivered on Skye

Well, that's all finished for this 3m shed.Very windy today, but all good in the end.
13/10/2026

Well, that's all finished for this 3m shed.
Very windy today, but all good in the end.

3 trips, 150 miles all round in journeys today delivering and installing sections to Gillen for the 3 x 3m shed.Floor bo...
12/10/2026

3 trips, 150 miles all round in journeys today delivering and installing sections to Gillen for the 3 x 3m shed.

Floor boards reinstated, wall section up and together.

Rest of the roof and top boards and door to go on tomorrow to finish it all up.

Well, the grass looks a bit sick, but it'll soon spring back.That's the shed all flatpacked for tomorrows move and rebui...
11/10/2026

Well, the grass looks a bit sick, but it'll soon spring back.

That's the shed all flatpacked for tomorrows move and rebuild.

Well, that's the roof finally in on this shed.A few more top boards and it'lm be ready to dismantle ship and rebuild.I'm...
09/10/2026

Well, that's the roof finally in on this shed.

A few more top boards and it'lm be ready to dismantle ship and rebuild.

I'm sure the wife will be happy to see the view and her garden once again.

15 days dodging some of the heavy rain (not all,) but it's good to get it towards completion.

On and off rain today 😒But at least all the shed roof is sheathed and membraned, just box profile and flashing to go on....
07/10/2026

On and off rain today 😒

But at least all the shed roof is sheathed and membraned, just box profile and flashing to go on.

Start of the top boards going on, Door is fully built, just needs an extra hinge and it'll soon be time to flat pack and reassemble at site.

What a miserable weekend we had, but today was much better.The rest of the wall boards went on, half the roofing osb and...
05/10/2026

What a miserable weekend we had, but today was much better.

The rest of the wall boards went on, half the roofing osb and membrane in place.

Half the roofboards and membrane to come still, with some fixings for the mini box profile, some roof flashing, the top boards for the walls and the door.

Almost ready to take it apart and reassemble at site.

All wrapped on the shed walls, nearly clad all 4 sides, ran out of fixings until tomorrow, and that will be the base cla...
01/10/2026

All wrapped on the shed walls, nearly clad all 4 sides, ran out of fixings until tomorrow, and that will be the base cladding all done.

OSB still to go on and a few extras such as some box profile and the door, but it's nearly there, to be flatpacked and rebuilt at site.

Windy today! Anyway...Roof panels all done.Membrane and tape going on and first cladding layer.Soon to do more wall clad...
30/09/2026

Windy today! Anyway...

Roof panels all done.
Membrane and tape going on and first cladding layer.

Soon to do more wall cladding, and the osb sheathing for the roof.

Wall frames up, roof framing panels tomorrow.Looking more and more like a shed now.Thankfully I also now have space to s...
28/09/2026

Wall frames up, roof framing panels tomorrow.

Looking more and more like a shed now.

Thankfully I also now have space to start to assemble a large Larch Logstore too.

Just realised, I've been doing woodwork bits since 2010, 16 years! Where did it all go?This was my original sign back th...
28/09/2026

Just realised, I've been doing woodwork bits since 2010, 16 years! Where did it all go?

This was my original sign back then!

Address

Portree

Alerts

Be the first to know and let us send you an email when DB Wood Mastercrafts posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share