04/09/2026
Pre-pipe done right.
This is where the whole job gets decided — long before tiling, gib, or fixtures go in. Every valve set to height, every outlet centred off the setout, hot and cold exactly where the tapware needs it.
Rush this stage and you’re chasing problems for the rest of the build. Get it right and everything downstream just works.
Setout on the wall, laser level running, every rough-in checked before it’s locked in behind the gib.
The part no one sees in the finished bathroom — the part that makes or breaks it.
29/07/2026
This old cylinder was failing and the safe tray drain had never been connected — sending overflow straight under the house instead of to the waste line. We replaced the cylinder, valves and reconfigured the pipework, correctly plumbed the tray, and got the whole install fitted into a seriously tight understairs cavity.
Small space, no shortcuts.
24/07/2026
We were called out to investigate ceiling moisture issues with no obvious cause. After a bit of fault-finding, we traced it back to strong nor’easterly winds driving water up under the roof sheets.
85m of flashings later, job sorted.
Flashings by the boys Roll and Fold
22/07/2026
A tidy retrofitted outdoor shower install today. Ready for post-beach rinses, pool days, and everything in between.
15/07/2026
LOW PRESSURE ➡️ MAINS PRESSURE
Out with the old Rheem low pressure cylinder, in with a new mains pressure vitreous enamel unit — full new valve set, tempering, and pipework done right.
What this means for the homeowner: proper pressure at every tap, showers and taps running at the same time without one dropping off, and no more waiting on the tank to catch up.
Got a low pressure system still installed? Get in touch for a free quote.
25/06/2026
Hi-spec brief. Hi-spec finish.
We stripped this Remuera home back and re-did the lot — full house repipe, new water heaters, three bathrooms, kitchen and laundry. Brushed tapware, freestanding baths, wall-mounted everything, and nothing on show that shouldn’t be.
An awesome project working in with:
14/05/2026
A quick flashing job ticked off
Custom soaker flashing supplied and delivered by the boys .nz installed over an existing asbestos vent pipe to tidy things up and keep everything watertight with a new decktite. While we were there we also shortened the old low pressure HWC vent that had been held up with wire stays, then installed and tested a new pressure reducing & relief valves.