05/17/2023
Some planter boxes I built using 6x6 pressure treated lumber. I drilled 5/8 rebar into the ground every 16 inches to keep it from pushing away from the building
Contact Keith @ Meyer Construction with questions and price quotes Residential & Commercial ~ Frame to finish
05/17/2023
Some planter boxes I built using 6x6 pressure treated lumber. I drilled 5/8 rebar into the ground every 16 inches to keep it from pushing away from the building
04/15/2021
Sweet little bathroom remodel for the kids of this house. I wish I could remember the name of the paint color!
This came out 👌👌👌
04/15/2021
I haven’t posted on this page in a long time but I’m still swinging a hammer! I’m going to start posting things on this page again so here I go...
This was a window bench I built for a client in Newton. They had their house retrofitted with central air and we had to figure out different ways of concealing the ductwork throughout the house. This was an efficient way of keeping this area of the room functional and also creating extra storage for the room.
11/22/2018
Framing and sheathing done by Meyer Construction for JWH Construction. We used prefab trusses on this building.
11/21/2018
Did this roof back in September by myself. Definitely remember some long hot days up there. 42 sq of shingles in one week.
11/20/2018
This is a floor I put down in October. A pipe let go and flooded the basement so I got the pleasure of putting it all back together. Good thing for homeowners insurance👷🏻♂️
11/18/2018
Almost done 👍
11/18/2018
Turning carpeted stairs into beautiful hardwood 🔨🔨🔨
02/01/2018
A mix of some work I’ve done
08/31/2017
Working on a restaurant down by Kenmore Sq. Doing some metal framing, drywall, and taping. Had to build a ton of soffits, and columns here👷🏻
12/30/2016
Accent wall with crown molding
12/29/2016
Here is a first getting the store fixtures before starting the demo