Rettberg Re-Contsruction

Rettberg Re-Contsruction

Share

Rettberg Re-Contsruction is committed to creating the perfect look to your home. Crown mould, interior doors, Windows, dry rot, We take pride in our work.

Photos from Rettberg Re-Contsruction's post 12/10/2017

This week, I worked for my brotha, and we succeeded in putting major amounts of Lipstick on a Pig. New Shower door, new door to the back yard, Baseboards throughout, pass thru rehab, dishwasher panel and vent pipe hider, staircase to the garage, multiple drywall patches and texture, water heater cabinet turned kitchen pantry....... Whew!!! Um tired just typing this stuff. Good job Mr. Braun.

Photos from Rettberg Re-Contsruction's post 11/04/2017

Drain the sink cuz dishes are done. Painted the work we did the last couple of days. Another super happy customer. Colder than Siberia today. The Boss did a great job on ordering perfect sized windows and doors. Right in. What's next Bossman?

Photos from Rettberg Re-Contsruction's post 11/01/2017

Yep, it's a beautiful thing.

Photos from Rettberg Re-Contsruction's post 10/30/2017

The wood has been stained. The Pergola is going up beautifully. This will be gorgeous when it is done.
Dilly Dilly!!!!

10/28/2017

Workin' double time, on the production line....... 🎢🎡🎢🎡🎢🎡🎢

Photos from Rettberg Re-Contsruction's post 10/27/2017

Moving right along. Damn it's πŸ”₯HOT. I got no spit or Sweat left. More water and Gatorade please.

10/26/2017

Today I'll be sanding and staining Lumber so we can build this tomorrow. Thank God it's not concrete oriented. Peace.

Photos from Rettberg Re-Contsruction's post 10/14/2017

Yesterday I was in the Mountains, today the Country. That's Camp Far West in the foreground. Beautiful day today.

Photos from Rettberg Re-Contsruction's post 10/13/2017

Finished the wall up at my Cuz' house. Only have a dump run and some other little weekend stuff. Came out alright for my 1St block wall. Probably my last, lol.

10/06/2017

Block wall is up. Today we fill with concrete, a little back fill and alot of clean up.

Photos from Rettberg Re-Contsruction's post 09/29/2017

Made the "hump" transition better, laid 72 blocks, did a little custom block cutting to make the turn. It was a better day.

Photos from Rettberg Re-Contsruction's post 09/28/2017

Block wall going in. A little pi**ed because I pounded some 1" rebar in 2 feet and it was off my mark. Made my refuse area out of square. Not to mention that I also have a hump. Holy Batsh*t Batman. The hump I can fix, but not the "out of square" box. I'll kick myself in the ass later.

Want your business to be the top-listed Furniture Store in Citrus Heights?

Click here to claim your Sponsored Listing.

Location

Website

Address


Citrus Heights, CA
95610