09/25/2026
Update: we have a time of the house moving! 8:30 a.m. Wednesday, September 30th, the house will begin its travel down the street, one block to its new home.
McCormick has been busy digging the new foundation. It’s a big house and we will have 9foot ceilings in the lower level. There will be a full bath, three bedrooms and a utility room with egress windows. And that is a lot of dirt! One pile is 20 feet high!
What is interesting as the dug the hole, is the findings of the house from the 1850’s that once stood on our vacant lot. Pictured is the old stone foundation and the old wood beam remains.
Excited to have the time and date for the move.
Thanks for following.